ENERGY EFFICIENCY SOLUTIONS

Stop paying for power your equipment wastes.

Most facilities receive higher voltage than their motors, lighting and HVAC actually need, and pay for the excess as wasted heat. Our ES-25 Smart Energy Saver optimises the voltage at the distribution boards feeding these loads, cutting your electricity costs with no change to your process or equipment.

Engineer with a power analyser beside a two-door ES-25 energy saver panel

Why choose us

Up to 20% Savings Significant reduction in electricity bills.
12–18 months Payback period Quick returns and strong ROI.
Longer life For your equipment Less stress, less heat, long-term reliability.
THE PROBLEM

Why energy saving matters

Overvoltage is common Many facilities receive utility voltage higher than their equipment needs. The excess does no useful work: you pay for it, and it is wasted as heat and extra wear on your equipment.
Reduced OPEX Optimising voltage lowers electricity cost, reduces equipment stress and supports your sustainability goals.
HOW IT WORKS

Working principle

  • Installed in series at the targeted distribution board, a low-loss, high-efficiency impedance-matching transformer generates a controlled opposing voltage to optimise the output supply.
  • Selectable tap adjustments bring incoming voltage to an efficient operating level, reducing overvoltage losses while maintaining equipment performance as per site requirements.
  • Correcting overvoltage reduces current draw, lowering electrical losses, heat generation and long-term equipment stress.
  • Marginally improves power factor, reducing associated losses.

Suitable load categories

Induction motors
Lighting systems
Exhaust fans
HVAC systems
Air coolers
Mixed office loads

Installation

  • Simple, non-invasive
  • In series at main or sub-panels
  • Indoor & outdoor configurations
Customisable from 12–750 kVA Scalable for any facility size
PLACEMENT

Where ES-25 sits in your electrical system

ES-25 panels go in front of the distribution boards that feed your heaviest loads: lighting, exhaust fans and induction motors. Each DB gets a panel sized to it, so you optimise exactly where the savings are.

Even if you have APFC or voltage stabilisation at the source, ES-25 panels can still be installed at selected distribution boards (DBs) to optimise voltage for downstream loads.
Single-line diagram: from utility through HT panel and main LT panel, three ES-25 panels each feed a distribution board for lighting, exhaust fans and induction motors
ACCREDITATIONS, TESTING & EVALUATION CPRI India, STQC India, CEA India, BEE ESCO accreditation, CRISIL ESCO evaluation
WHAT’S NEXT?

How much is overvoltage costing you? Find out in a few hours.

We connect our portable demo unit to your load and measure the savings live at your site. No disruption, no commitment.

Book a free site demo
OUR SOLUTIONS ARE TRUSTED BY
  • AIIMS Deoghar
  • Government of Jharkhand
  • Tata Steel
  • Bharat Coking Coal Limited
  • Dr Lal PathLabs
  • NTPC
  • Siemens
  • Cipla
  • Damodar Valley Corporation
  • Schneider Electric
  • Central Coalfields Limited
  • Hindalco, Aditya Birla Group
  • Infosys
  • Tata Power
  • Vedanta
  • JBM Group
  • Jindal Steel & Power
  • LG
  • Dalmia Bharat
  • Amber
  • ACC Limited
  • Honda
  • Tata Group
  • Unilever
  • Murugappa Group